DOC - Permit Finaled | 6/19/2015 | 6/19/2015 | 6/19/2015 | P | PASS |
Andy J. Long
|
|
|
Site final and document final. 3 new Harris Crossing townhomes are now complete and stabilized. ESC conditions satisfied.
|
Aging Inspection | 6/4/2015 | 6/4/2015 | 6/4/2015 | | PASS |
Evan Jenkins
|
|
|
No issues at this time
|
Site Preparation | 1/4/2015 | 1/5/2015 | 1/5/2015 | A | PASS |
Andy J. Long
|
|
|
Phone #: ###-#### Inspection requested via web by Austin Wagner
Lucky Harris sub BMPs installed and include inlet protection on the private stormdrain system and buffer + wattle perimeter protection to rear of the homesites keeping sediment out of the Idaho Power easement/wetland area. Approved to begin. Excavator Ron onsite and said will clean any trackout on sidewalks. Homesites are 3 in a row with central driveways.
|