Aging Inspection | 10/13/2017 | 10/13/2017 | 10/13/2017 | | PASS |
Michael Zawacki
|
|
|
Town home complete and stabalization finished. Neighborhood BMPs will remain in place during project duration.
|
DOC - Permit Finaled | 10/13/2017 | 10/13/2017 | 10/13/2017 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 7/5/2017 | 7/5/2017 | 7/5/2017 | P | PASS |
Melissa Jannusch
|
|
|
WIP on interior and exterior finishes. Landscaping not complete yet. Sidewalk should be swept before ESC final.
|
Site Preparation | 1/23/2017 | 1/24/2017 | 1/24/2017 | A | PASS |
Melissa Jannusch
|
|
|
Joey Phone #: ###-#### DI protected. Requested cleaning of sediment bags once the ice melts. Sign posted. Stagging area looks good. Pollution prevention measure in place. Talked with Joey about concrete washout. It is located at existing dallas harris #4 site garage nearby.
|