DOC - Permit Finaled | 11/1/2017 | 11/1/2017 | 11/1/2017 | P | PASS |
Michael Zawacki
|
|
|
|
Complaint Inspection | 6/16/2017 | 6/16/2017 | 6/21/2017 | P | PASS |
Melissa Jannusch
|
|
|
Trash contained, no trackout, signs are posted. Concrete slurry in dirt alleyway. Slurry not in danger of running off into a storm drain. Alley is to be paved soon as well. Area is flat large field behind project. No corrections issued at the time of inspection.
|
General Inspection | 3/17/2017 | 3/17/2017 | 3/17/2017 | P | PASS |
Melissa Jannusch
|
|
|
Foundations poured. Sediment contained on site. Sign is posted. No ESC issues observed. Project okay.
|
General Inspection | 3/17/2017 | 3/17/2017 | 3/17/2017 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/13/2017 | 3/13/2017 | 3/13/2017 | P | PASS |
Melissa Jannusch
|
|
|
Foundations poured. No ESC issues observed. Signs are posted.
|
Site Preparation | 2/9/2017 | 2/9/2017 | 2/10/2017 | P | PASS |
Andy J. Long
|
|
|
Approved for construction. RP-GC to post permit sign on billboard. Crew finishing up sewer connections and keeping the street clean. Reviewed housekeeping BMPs and hauling away excess backfill from excavation to avoid sediment running off site.
Approved for construction.
|