Aging Inspection | 10/20/2017 | 10/20/2017 | 10/23/2017 | | PASS |
Michael Zawacki
|
|
|
SFH complete. Landscaping done and final stabalization done.
|
DOC - Permit Finaled | 10/23/2017 | 10/23/2017 | 10/23/2017 | P | PASS |
Michael Zawacki
|
|
|
|
Tracking Control | 3/1/2017 | 3/1/2017 | 3/2/2017 | P | FAIL |
Andy J. Long
|
|
|
correction request to Mandi with Wood Bros to provide street sweeping and concrete washout facility for Millwell Sub. Canyon Crest, Asbury, and Treasured Homes using Wood Bros. as ESC RP
|
General Inspection | 2/23/2017 | 2/24/2017 | 2/23/2017 | P | PASS |
Melissa Jannusch
|
|
|
Corrections addressed
|
Site Preparation | 2/14/2017 | 2/20/2017 | 2/23/2017 | P | CANC |
Melissa Jannusch
|
|
|
|
BMP Violation | 2/14/2017 | 2/14/2017 | 2/14/2017 | P | FAIL |
Melissa Jannusch
|
|
|
Dirt piled on side walk, significant trackouk on Hammermill. Uncontained pile of trash. Windblown trash. Corrections requested. Clean up and contain trash. Clean off dirt from road and sidewalk. Move dirt pile off of sidewalk.
|
Site Preparation | 1/17/2017 | 1/17/2017 | 1/17/2017 | P | PASS |
Andy J. Long
|
|
|
Dave Phone #: ###-####
Permit sign posted. Frozen & snow covered conditions currently. Builder waiting for better conditions to build.
After snowmelt, need to check on subdivision BMPs (inlet protection, designated washout)
|