General Inspection | 7/27/2018 | 7/27/2018 | 7/27/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 7/27/2018 | 7/27/2018 | 7/27/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 6/11/2018 | 6/11/2018 | 6/11/2018 | | PASS |
Michael Zawacki
|
|
|
WIP on new foundations and finishing interior of other units. Concrete washout and dumpster on site. Site is clean and contained.
|
General Inspection | 4/24/2018 | 4/24/2018 | 4/26/2018 | | PASS |
Andy J. Long
|
|
|
WIP on foundations. Trash contained. No trackout. Subdivsion storm drains have inlet sediment protection that have remaining capacity. Approved.
|
General Inspection | 3/9/2018 | 3/9/2018 | 3/9/2018 | | PASS |
Michael Zawacki
|
|
|
WIP on new foundations and existing interiors. DIs have ben maintained. Some dirt on interior road that is usally cleaned end of week.
|
General Inspection | 1/22/2018 | 1/22/2018 | 1/22/2018 | | PART |
Michael Zawacki
|
|
|
WIP. Large pile of trash on west side. Workers cutting styrofoam and will need to clean up mess.
|
General Inspection | 12/5/2017 | 12/5/2017 | 12/5/2017 | | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 10/17/2017 | 10/17/2017 | 10/18/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/1/2017 | 9/1/2017 | 9/5/2017 | | CANC |
Andy J. Long
|
|
|
|