General Inspection | 8/14/2018 | 8/14/2018 | 8/14/2018 | | PASS |
Andy J. Long
|
|
|
Townhome complete. Active projects have ESC coverage.
|
DOC - Permit Finaled | 8/14/2018 | 8/14/2018 | 8/14/2018 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/29/2018 | 6/29/2018 | 6/29/2018 | | PASS |
Andy J. Long
|
|
|
WIP. Subdivision storm drains have sediment protection. No trackout or discharges to Hill Road. Trash contained, no fugitive dust issues observed.
|
General Inspection | 5/14/2018 | 5/14/2018 | 5/16/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/27/2018 | 3/27/2018 | 3/27/2018 | P | PART |
Michael Zawacki
|
|
|
WIP. Lots of trackout on site.
|
General Inspection | 2/12/2018 | 2/12/2018 | 2/15/2018 | | PASS |
Michael Zawacki
|
|
|
WIP
|
General Inspection | 12/26/2017 | 12/26/2017 | 12/26/2017 | | PASS |
Michael Zawacki
|
|
|
WIP at site. Snow on ground. No violations observed.
|