Site Final | 5/29/2018 | 5/30/2018 | 5/30/2018 | A | PASS |
Andy J. Long
|
|
|
Home occupied, homeowner to complete landscaping. No sediment runoff or trackout issues observed. No MS4 on street. Vegetated buffer. ESC permit finaled.
|
Aging Inspection | 5/29/2018 | 5/29/2018 | 5/29/2018 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
Random Inspection | 3/26/2018 | 3/26/2018 | 3/26/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on interior. Front yard not yet fully landscaped. No ESC corrections needed.
|
General Inspection | 3/6/2018 | 3/6/2018 | 3/6/2018 | A | PASS |
Michael Zawacki
|
|
|
No dirt leaving site. Natural buffer in place, dirt disturbance complete, area is flat.
|
Aging Inspection | 1/25/2018 | 1/25/2018 | 1/25/2018 | | PASS |
Michael Zawacki
|
|
|
WIP. Permit is posted in back yard. Yard is all exposed, buffer strip remains. No issues with trackout or runoff. Worker on site parked on concrete driveway.
|
Random Inspection | 7/10/2017 | 7/10/2017 | 7/10/2017 | A | PASS |
Andy J. Long
|
|
|
ESC permit sign posted. No trackout, loose trash or other issues. WIP on foundation
|
Site Preparation | 4/17/2017 | 4/17/2017 | 4/17/2017 | P | PASS |
Melissa Jannusch
|
|
|
Met with RP on site. Site is low risk flat lot surrounded by vegetation. Sign is posted. Talked with RP about ESC policies: trash containment, concrete washout, dust control, inspection protocols. Okay to start.
James Phone #: ###-####
|