Site Final | 5/30/2018 | 5/30/2018 | 5/30/2018 | A | PASS |
Andy J. Long
|
|
|
Project complete. All permits finaled. Site is landscaped /stabilized. No loose debris or temp BMPs remaining.
|
Random Inspection | 5/7/2018 | 5/7/2018 | 5/7/2018 | P | PASS |
Michael Zawacki
|
|
|
Building complete and open, almost all landscaping complete, still some forms in place for walkway. Drain inlet protection at corner of Hadley & Ardene and in drain building on southside of building. They will need to be removed before permit is finalled.
|
Random Inspection | 1/2/2018 | 1/2/2018 | 1/2/2018 | A | PASS |
Andy J. Long
|
|
|
WIP on site and building interior. Parking lot is paved, stabilized construction access. No violations observed.
Note: no trackout currently from vacant lot on Ardene. Fence installed at Del Taco has been knocked down. Will request new solution once trackout occurs again.
|
General Inspection | 11/14/2017 | 11/14/2017 | 11/14/2017 | P | PASS |
Michael Zawacki
|
|
|
Building up and framed. Nampa Paving scheduled to pave lot later this week. Trackout on Ardene coming from customers at food services down the street. Site is clean and not contributing to tracking.
|
General Inspection | 10/2/2017 | 10/12/2017 | 10/16/2017 | P | PASS |
Michael Zawacki
|
|
|
Clean site. Entrance used, washouts maintained and used, perimeter controls in place. Free from fugitive dust. DIs in place and clean.
|
Site Preparation | 10/2/2017 | 10/2/2017 | 10/2/2017 | P | PASS |
Andy J. Long
|
|
|
WIP. No site preparation inspection requested by RP/contractor.
BMPs installed include constructioin entrance and perimeter fencing, inlet protection. Permit sign posted on fence.
|