General Inspection | 12/4/2018 | 12/4/2018 | 12/4/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 12/4/2018 | 12/4/2018 | 12/4/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 10/19/2018 | 10/19/2018 | 10/19/2018 | | PASS |
Michael Zawacki
|
|
|
Prepping for parking lot. Pile of pit run is on road, currently being brought onto site. Very little dust, no dirt being tracked from work area.
|
General Inspection | 9/3/2018 | 9/3/2018 | 9/4/2018 | | PASS |
Michael Zawacki
|
|
|
Site is contained. Workers prepping planter boxes along main st. No dirt or dust leaving site.
|
General Inspection | 7/17/2018 | 7/17/2018 | 7/17/2018 | P | PASS |
Michael Zawacki
|
|
|
Site is contained, most of work area is below grade. Dumpster on site, no loose trash. Material storage all within disturbed area.
|
General Inspection | 6/12/2018 | 6/12/2018 | 6/12/2018 | P | PASS |
Michael Zawacki
|
|
|
WIP on vertical construction. Site is below grade of sidewalk and has blown bark wattles. No trackout or trash leaving site. No dust.
|
General Inspection | 5/24/2018 | 5/24/2018 | 5/24/2018 | | PASS |
Michael Zawacki
|
|
|
WIP on vertical. Site still surrounded by wood chip wattles, DIs are all protected. Storage and parking are all on paved lot. Site is clean.
|
Random Inspection | 1/4/2018 | 1/4/2018 | 1/4/2018 | A | PASS |
Andy J. Long
|
|
|
Surrounding MS4 inlets have sediment bag protection. No trackout or discharges observed. Vertical construction in progress.
|
Random Inspection | 12/18/2017 | 12/18/2017 | 12/18/2017 | P | PASS |
Michael Zawacki
|
|
|
perimeter control in tact. Cutting cinder blocks, saw has water system to prevent dust. No trackout or dust leaving site.
|
General Inspection | 11/29/2017 | 11/29/2017 | 11/29/2017 | P | PASS |
Andy J. Long
|
|
|
WIP on connecting underground utilities to site. No trackout or discharges.
|
Site Final | 11/29/2017 | 11/29/2017 | 11/29/2017 | P | CANC |
Andy J. Long
|
|
|
|