General Inspection | 8/10/2018 | 8/10/2018 | 8/10/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 8/10/2018 | 8/10/2018 | 8/10/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 7/26/2018 | 7/26/2018 | 7/26/2018 | | PASS |
Michael Zawacki
|
|
|
Will close when building permit closed.
|
General Inspection | 7/11/2018 | 7/11/2018 | 7/11/2018 | | PASS |
Michael Zawacki
|
|
|
Building permit still open.
|
General Inspection | 6/25/2018 | 6/25/2018 | 6/25/2018 | | PASS |
Michael Zawacki
|
|
|
Work completed and site stable. Will final when building permit is closed.
|
Random Inspection | 2/26/2018 | 2/26/2018 | 2/26/2018 | P | PASS |
Andy J. Long
|
|
|
Wattles were installed as directed. No activity at time of inspection. site properly closed to prevent muddy runoff. No new corrections requested.
|
General Inspection | 2/8/2018 | 2/9/2018 | 2/9/2018 | P | PEND |
Andy J. Long
|
|
|
|
General Inspection | 2/8/2018 | 2/8/2018 | 2/8/2018 | P | FAIL |
Andy J. Long
|
|
|
No significant issues, need to install straw wattle perimeter control below the stockpile across street from project. Sweep 24th.
Verbal correction issued to onsite contact Leno with Urban Escapes. Called RP Terry
|
Complaint Inspection | 2/5/2018 | 2/5/2018 | 2/8/2018 | P | CANC |
Andy J. Long
|
|
|
complaint was regarding different project, the Lancaster Heights water tank and utility project.
|