Site Final | 8/9/2018 | 8/10/2018 | 8/10/2018 | A | PASS |
Andy J. Long
|
|
|
HOme complete, landscaped, and cleaned. ESC permit conditions satisfied.
|
General Inspection | 8/7/2018 | 8/7/2018 | 8/9/2018 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
Random Inspection | 3/26/2018 | 3/26/2018 | 3/26/2018 | P | PASS |
Michael Zawacki
|
|
|
Home is framed. Trash is in trashbox, no issues.
|
Site Preparation | 11/22/2017 | 11/27/2017 | 11/27/2017 | P | PASS |
Andy J. Long
|
|
|
Clint Phone #: ###-####
Permit sign posted. BMPs installed. RP for East Valley on site. Approved for construction.
|