General Inspection | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | PASS |
Michael Zawacki
|
|
|
Site is idle and everything now overgrown.
|
General Inspection | 4/8/2019 | 4/8/2019 | 4/8/2019 | | PASS |
Michael Zawacki
|
|
|
No new activity. Site has become overgrown and is stable.
|
Aging Inspection | 2/6/2019 | 2/6/2019 | 2/8/2019 | | PASS |
Andy J. Long
|
|
|
No new construction activity. No sediment runoff or other issues observed. Large vegetated stockpiles on site. BLD permit has not been issued but was recently extended 180 days on 12/11/2018
|
General Inspection | 12/6/2018 | 12/6/2018 | 12/6/2018 | P | PASS |
Michael Zawacki
|
|
|
No activity.
|
General Inspection | 10/18/2018 | 10/18/2018 | 10/18/2018 | P | PASS |
Michael Zawacki
|
|
|
No new activity. Area is overgrown with weeds and stable.
|
General Inspection | 10/1/2018 | 10/1/2018 | 10/1/2018 | P | PASS |
Michael Zawacki
|
|
|
No new activity, stockpiles have weed growth and are stable.
|
General Inspection | 8/14/2018 | 8/14/2018 | 8/14/2018 | P | PASS |
Michael Zawacki
|
|
|
No work. Site and stockpiles overgrown with weeds and stable.
|
Random Inspection | 5/11/2018 | 5/11/2018 | 5/11/2018 | P | PASS |
Michael Zawacki
|
|
|
No new activity, still stockpiles on site.
|
General Inspection | 4/26/2018 | 4/26/2018 | 4/26/2018 | P | PASS |
Michael Zawacki
|
|
|
No work, just stockpiles.
|
General Inspection | 2/28/2018 | 2/28/2018 | 2/28/2018 | P | PASS |
Michael Zawacki
|
|
|
SIte is stockpile storage. No activity.
|
Random Inspection | 1/18/2018 | 1/18/2018 | 1/18/2018 | P | PASS |
Michael Zawacki
|
|
|
Stockpiling. Construction entrance to Saturn Way. No trackout or dirt leaving site.
|
General Inspection | 1/2/2018 | 1/11/2018 | 1/11/2018 | P | PART |
Andy J. Long
|
|
|
No trackout, contractor notified ESC division about the temporary stockpiling that is occuring.
RP stated plan is start in February once utility and permanent stormwater plans are finalized.
correction request: -install sign board to post ESC permit and SWPPP information, notify inspector to post permit. - install sediment protection on storm drain on Saturn just south of site entrance.
|
General Inspection | 1/2/2018 | 1/2/2018 | 1/2/2018 | P | PASS |
Andy J. Long
|
|
|
Grading for project has not yet started. Stockpiles placed on lot prior to GRD issuance still onsite. More stockpiling is occuring by Lurre Construction. No trackout to Saturn, rock construction entrance installed. Will check conditions next week during warm weather to check for snowmelt discharges or trackout.
|
Random Inspection | 12/15/2017 | 12/15/2017 | 12/15/2017 | P | PASS |
Michael Zawacki
|
|
|
No trackout. Construction entrance installed. Massive stock piles on site.
|