Site Final | 8/22/2019 | 8/22/2019 | 8/22/2019 | A | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 8/22/2019 | 8/22/2019 | 8/22/2019 | P | PASS |
Mike Jordan
|
|
|
|
Aging Inspection | 8/6/2019 | 8/6/2019 | 8/7/2019 | | PASS |
Michael Zawacki
|
|
|
Exterior work completed. Landscaper on site.
|
General Inspection | 6/6/2019 | 6/6/2019 | 6/6/2019 | P | PASS |
Michael Zawacki
|
|
|
Exterior work completed. Lot is overgrown with weeds but stable.
|
Aging Inspection | 4/22/2019 | 4/22/2019 | 4/22/2019 | | PASS |
Michael Zawacki
|
|
|
Home is framed. All building waste is on driveway.
|
Aging Inspection | 2/19/2019 | 2/19/2019 | 2/19/2019 | | CANC |
Andy J. Long
|
|
|
|
Random Inspection | 12/17/2018 | 12/17/2018 | 12/17/2018 | P | PASS |
Andy J. Long
|
|
|
No loose trash piles, no trackout. Site was cleaned up after flat work. Posted new ESC sign for the 4 projects.
|
General Inspection | 11/7/2018 | 11/7/2018 | 11/8/2018 | P | PART |
Michael Zawacki
|
|
|
Foundations all poured and washout hauled away. Lots of dirt on sidewalk that needs to be swept.
|
BMP Violation | 10/15/2018 | 10/15/2018 | 10/15/2018 | P | PASS |
Michael Zawacki
|
|
|
All mud was cleaned from sidewalk and street.
|
BMP Violation | 10/12/2018 | 10/12/2018 | 10/12/2018 | P | FAIL |
Michael Zawacki
|
|
|
Excavator running on site, road and sidewalk covered in mud. Talked to crew doing work, said they will clean by end of day.
|