Site Final | 4/10/2019 | 4/10/2019 | 4/10/2019 | P | PASS |
Andy J. Long
|
|
|
Temporary BMps to remain installed for project next door. See ESC18-01529
|
General Inspection | 3/19/2019 | 3/19/2019 | 3/20/2019 | | PASS |
Michael Zawacki
|
|
|
New building is complete and parking lot paved. Area still needs to be landscaped in front of building and parking islands. No ESC issues.
|
General Inspection | 2/1/2019 | 2/1/2019 | 2/1/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/17/2018 | 12/17/2018 | 12/17/2018 | | PASS |
Andy J. Long
|
|
|
WIP on interior. Permit sign posted at front of site. Exterior parking lot and curbing are complete. No loose dirt, no muddy runoff. Landscaping not yet installed .
|
General Inspection | 10/30/2018 | 10/30/2018 | 10/30/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/14/2018 | 9/14/2018 | 9/17/2018 | | PASS |
Michael Zawacki
|
|
|
Back lot and area around building are all paved. Dumpster on site, no loose trash, permit sign displayed in front of building.
|
General Inspection | 6/11/2018 | 6/26/2018 | 6/26/2018 | P | PASS |
Michael Zawacki
|
|
|
Large stockpile in back of lot. Concrete washout is installed, fuel in secondary containment. A few old outpaks on site. One small area where something has been washed out. Entrance has been built up to street level, looks to be pit run.
|
General Inspection | 6/11/2018 | 6/11/2018 | 6/11/2018 | A | PASS |
Andy J. Long
|
|
|
WIP on foundation. Permit sign posted. No trackout or fugitive dust observed. Large stockpile onsite. Will check back in two weeks for stabilizatio/dust control.
|