General Inspection | 10/18/2018 | 10/18/2018 | 10/18/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 10/18/2018 | 10/18/2018 | 10/18/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 | P | PASS |
Michael Zawacki
|
|
|
Building shell is up, masons cutting and fitting bricks along lower section, some dust from saw. Water truck arrived while I was on site. Most areas below grade of road, spot where it is not are protected by wattles. Forms are in place for curbing, crews working on prep for pour. Eco pan on site.
|
General Inspection | 5/18/2018 | 5/21/2018 | 5/23/2018 | P | PASS |
Michael Zawacki
|
|
|
check site. Started w/o site prep. Left grass buffer and are working below grade, made field level change to omit wattle. Entrance is onto paved area, bringing sweeper as needed. Waiting for Suez and Idaho Power to move utilities so entrances can be constructed in their final spots. DIs have filter fabric, I asked for witches hats with overflow protection. Washout on site.
|