General Inspection | 9/28/2018 | 9/28/2018 | 9/28/2018 | P | DONE |
Andy J. Long
|
|
|
Demolition complete. New SFH on parcel coverd under ESC18-00435.
|
DOC - Permit Finaled | 9/28/2018 | 9/28/2018 | 9/28/2018 | P | PASS |
Andy J. Long
|
|
|
|
Complaint Inspection | 5/17/2018 | 5/17/2018 | 5/18/2018 | P | FAIL |
Andy J. Long
|
|
|
Work still occuring at site, basement excavation. BLD permit already finaled.
Excavated dirt was hauled to a non-permitted site 4612 Gage Street. A UST with heating oil was uncovered and some reportedly spilled. 300 gallons extracted from tank by Gem State Recovery
Contaminated dirt at Gage Street is currently being tested and is scheduled to be hauled away Monday. Stockpiles have been covered, and located to center of lot.
|