Site Final | 1/22/2020 | 1/22/2020 | 1/22/2020 | A | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 1/20/2020 | 1/20/2020 | 1/22/2020 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 11/18/2019 | 11/20/2019 | 11/20/2019 | P | NR |
Michael Zawacki
|
|
|
Inlet preotection still in Linder. I was unable to get grates to break free. Sent message to ACHD to see if they have crew and equipment that can get them out.
|
General Inspection | 11/18/2019 | 11/18/2019 | 11/18/2019 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 9/16/2019 | 9/16/2019 | 9/16/2019 | | PASS |
Michael Zawacki
|
|
|
Work done and now stabalized. Inlet protection still installed on Linder.
|
General Inspection | 7/15/2019 | 7/15/2019 | 7/15/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/13/2019 | 5/13/2019 | 5/13/2019 | | PASS |
Michael Zawacki
|
|
|
Not landscaped, weeds starting to grow.
|
General Inspection | 3/13/2019 | 3/13/2019 | 3/13/2019 | | PASS |
Michael Zawacki
|
|
|
Work complete, site not revegetative.
|
General Inspection | 9/25/2018 | 9/25/2018 | 9/26/2018 | P | PASS |
Michael Zawacki
|
|
|
Curbing complete, acting as perimeter control. No trackout leaving site, some dust blowing off truck as it drove away. No dust from excavator on site.
|