Site Final | 8/20/2019 | 8/20/2019 | 8/20/2019 | P | PASS |
Michael Zawacki
|
|
|
|
Site Final | 7/11/2019 | 7/11/2019 | 7/11/2019 | P | NR |
Michael Zawacki
|
|
|
Landscaping not finished, not stabalized.
|
Aging Inspection | 7/10/2019 | 7/10/2019 | 7/10/2019 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final. Site still in process of landscaping.
|
Tracking Control | 12/10/2018 | 12/10/2018 | 12/10/2018 | P | FAIL |
Michael Zawacki
|
|
|
No entrance, site is half froze and muddy. Left message with listed RP Justin. Some tracking onto northview.
|