General Inspection | 8/29/2018 | 8/29/2018 | 8/29/2018 | P | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 8/29/2018 | 8/29/2018 | 8/29/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 7/27/2018 | 7/27/2018 | 7/27/2018 | P | PASS |
Andy J. Long
|
|
|
First section of path from the Friendship bridge to the Greenbelt and road is complete. Second section will be installed around the Zoo perimeter. Stockpile stored along road belongs to pathway project, may require protection or relocation. Not stored next to storm drain.
|
General Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | PASS |
Michael Zawacki
|
|
|
WIP on bed for path. Hazel Asphalt on site dropping of equipment, plan to pa ve tommorow at noon. Wattle is protecting near river. No ESC issues.
|