General Inspection | 6/5/2019 | 6/5/2019 | 6/5/2019 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 6/5/2019 | 6/5/2019 | 6/5/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 5/16/2019 | 5/16/2019 | 5/16/2019 | | PASS |
Andy J. Long
|
|
|
|
Site Final | 3/27/2019 | 3/28/2019 | 3/29/2019 | A | NR |
Andy J. Long
|
|
|
Not fullty landscaped.
|
General Inspection | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | PART |
Michael Zawacki
|
|
|
Lots of lumber scraps laying around, can use good cleanup. No dirt or dust leaving site.
|
General Inspection | 8/23/2018 | 8/23/2018 | 8/23/2018 | P | FAIL |
Michael Zawacki
|
|
|
No washout, sunroc truck dumped straight onto ground, also lots of track out.
|
Site Preparation | 7/25/2018 | 7/26/2018 | 7/26/2018 | A | PASS |
Andy J. Long
|
|
|
Bryan Phone #: ###-####
Permit sign posted. Site approved for construction, RP is on duty. After excavation and foundation, and backfilling additional perimeter controls may be required to keep sediment on site.
|