Site Final | 5/16/2019 | 5/16/2019 | 5/16/2019 | P | PASS |
Andy J. Long
|
|
|
Home complete, landscaped, and occupied.
|
General Inspection | 10/4/2018 | 10/18/2018 | 10/18/2018 | A | PASS |
Michael Zawacki
|
|
|
Work has just begun on framing. Pit run driveway in place, workers parking off 28th. Some building material being stored on road/private drive. Backfill still on site. No current ESC violations.
|
General Inspection | 10/4/2018 | 10/4/2018 | 10/4/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on foundation. No sediment runoff from site. Trash contained. Permit posted. Will follow up for inlet protection on receiving storm drain.
|