Site Final | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | PASS |
Michael Zawacki
|
|
|
Called in by ESI
|
Aging Inspection | 9/13/2019 | 9/13/2019 | 9/13/2019 | | PASS |
Michael Zawacki
|
|
|
WIp on sidewalks. Site is clean and contained, washouts in use.
|
General Inspection | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | PASS |
Michael Zawacki
|
|
|
New construction entrance installed. No messes on site, no ESC issues.
|
General Inspection | 12/12/2018 | 12/12/2018 | 12/12/2018 | P | PASS |
Michael Zawacki
|
|
|
Footings poured, eco pan on site. Old parking lot wasn't removed, keeps disturbed area and mud to minnimum. Not much activity today due to weather, no ESC issues.
|
General Inspection | 10/19/2018 | 10/25/2018 | 10/25/2018 | A | PASS |
Michael Zawacki
|
|
|
Building is demoed, currently hauling rubble away. ater truck on site, workers spraying pile as it is being loaded to minimize dust. ESI plans on staging work and keeping parking lot in place as long as possible in order to minimize disturbed area.
|
Site Preparation | 10/18/2018 | 10/18/2018 | 10/19/2018 | P | PASS |
Andy J. Long
|
|
|
Justin 208.830.0687
Reviewed ESC plan with project manager-RP. Old fire station to be replaced with new station. BMPs include fugtive dust control during demolition, inlet protection on storm drain @ sycamore and State Street and preserving existing stabilized site access and perimeter curbing.
Approved for construction
|