Site Final | 3/18/2019 | 3/18/2019 | 3/18/2019 | P | PASS |
Michael Zawacki
|
|
|
|
Site Preparation | 10/31/2018 | 11/6/2018 | 11/7/2018 | A | PART |
Michael Zawacki
|
|
|
Installed permit sign. No BMPS installed on site, currently no activity. Site has fence blocking access.
|
Conference | 10/31/2018 | 10/31/2018 | 10/31/2018 | P | DONE |
Andy J. Long
|
|
|
project manager Bart w/ Leap Charities notified that site work will be covered under this permit and Wood Bros. RP will manage concrete washout, construction entrance, and trash containment. ESC division will post new ESC sign next. Bart 208.284.0389
|
Conference | 9/28/2018 | 10/1/2018 | 10/2/2018 | A | PEND |
Andy J. Long
|
|
|
check on ROS and site work without permit
|
General Inspection | 9/28/2018 | 9/28/2018 | 9/28/2018 | P | PEND |
Michael Zawacki
|
|
|
Demo complete. Site work for new development started. Trenches and lines have been run.
|