Site Final | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | PASS |
Andy J. Long
|
|
|
Home complete. Subdivision BMPs to remain installed for active construction.
|
BMP Violation | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | PASS |
Andy J. Long
|
|
|
Corrective actions completed:
- new lined washout with sign has been installed - old washouts cleaned up - trash picked up - street swept - workers are not parking on open muddy lots. - RP onsite for subdivision walkthrough
Correction request: - allow DI sediment bags to drain and do maintenance on all inlets. Remove dirt and mud collected at surface prior to changing DI bags
|
Conference | 1/31/2019 | 2/1/2019 | 2/4/2019 | A | CANC |
Andy J. Long
|
|
|
|
BMP Violation | 1/31/2019 | 1/31/2019 | 1/31/2019 | P | FAIL |
Michael Zawacki
|
|
|
Multiple uncontained washouts, dirt and trash. Message left with RP
|