Permit Information
Permit NumberESC18-01283
StatusFinaled
Name COLE KRUEGER
Site Address 2909 W ELDER ST
Project NameBoise Airport Hotel
Customer Number 
ePlanReviewNo
Description
4 story wood framed hotel
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection6/9/20206/9/20206/10/2020 CANC
DetailsMichael Zawacki
DOC - Permit Finaled6/10/20206/10/20206/10/2020PPASS
DetailsMichael Zawacki
General Inspection4/24/20204/24/20204/24/2020 PASS
DetailsMichael Zawacki
All work completed and area stable.
DI bags need to be removed.
General Inspection3/9/20203/9/20203/9/2020PPASS
DetailsMichael Zawacki
Exterior completed, parking lot paved and site landscaped. Work is all interior.
General Inspection1/31/20202/6/20202/10/2020PPASS
DetailsMichael Zawacki
Lawnco on site doing sprinkler install. All disturbances are contained with island or between lot and sidewalk. Exterior hotel work completed. No esc issues.
General Inspection1/31/20201/31/20201/31/2020 PASS
DetailsAndy J. Long
WIP on installing sprinkler lines. No trackout from site, trashcontained. Will need to clean up any mud or dirt left on gutter or curb after irrigation line backfill.
General Inspection12/16/201912/16/201912/16/2019PPASS
DetailsMichael Zawacki
Building exterior completed, parking lot paved and sidewalks done. Landscapers on site.
Winter work will be interior.
General Inspection11/5/201911/5/201911/6/2019 PASS
DetailsAndy J. Long
No trackout, discharges or other violations observed. WIP on vertical
General Inspection9/20/20199/20/20199/20/2019PPASS
DetailsMichael Zawacki
Met with foreman at site.
Still waiting for site work to finish curbing and gutters, want to be paved asap.
Trash is being picked up, none blowing off site.
No esc issues.
General Inspection9/4/20199/4/20199/4/2019 PASS
DetailsMichael Zawacki
Hotel is framed, loit isa below grade. Site is clean, no trackout or trash, no dust observed.
Curbing completed around lot, is contained.
General Inspection7/19/20197/19/20197/19/2019 PASS
DetailsMichael Zawacki
WIP on vertical. Two stabalized entrances at site.
No dust or trackout. No loose trash.
Tracking Control4/4/20194/5/20194/8/2019APASS
DetailsMichael Zawacki
Gate onto elder is shut, traffic being sent through stabalized entrance.
General Inspection4/1/20194/4/20194/4/2019AFAIL
DetailsMichael Zawacki
Trackout onto Elder directly from site. Gate to Elder is closed, still looks like it is being used for occasional access. Follow up for Friday to see if contractor cleans up or needs a correction issued.
General Inspection4/1/20194/1/20194/1/2019PPART
DetailsMichael Zawacki
Sand has been dumped on stabalized entrance for use in seepage beds. Some trackout from front onto Elder, sweeper on site. Will bring washout before pouring. Follow up scheduled for thursday.
Site Preparation3/1/20193/4/20193/4/2019APEND
DetailsMichael Zawacki
Wattle needs to be trenched and stakes placed at 5'. Talked to project manager on site to get repaired.
Entrance installed, DI protection installed.