General Inspection | 6/9/2020 | 6/9/2020 | 6/10/2020 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 6/10/2020 | 6/10/2020 | 6/10/2020 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 4/24/2020 | 4/24/2020 | 4/24/2020 | | PASS |
Michael Zawacki
|
|
|
All work completed and area stable. DI bags need to be removed.
|
General Inspection | 3/9/2020 | 3/9/2020 | 3/9/2020 | P | PASS |
Michael Zawacki
|
|
|
Exterior completed, parking lot paved and site landscaped. Work is all interior.
|
General Inspection | 1/31/2020 | 2/6/2020 | 2/10/2020 | P | PASS |
Michael Zawacki
|
|
|
Lawnco on site doing sprinkler install. All disturbances are contained with island or between lot and sidewalk. Exterior hotel work completed. No esc issues.
|
General Inspection | 1/31/2020 | 1/31/2020 | 1/31/2020 | | PASS |
Andy J. Long
|
|
|
WIP on installing sprinkler lines. No trackout from site, trashcontained. Will need to clean up any mud or dirt left on gutter or curb after irrigation line backfill.
|
General Inspection | 12/16/2019 | 12/16/2019 | 12/16/2019 | P | PASS |
Michael Zawacki
|
|
|
Building exterior completed, parking lot paved and sidewalks done. Landscapers on site. Winter work will be interior.
|
General Inspection | 11/5/2019 | 11/5/2019 | 11/6/2019 | | PASS |
Andy J. Long
|
|
|
No trackout, discharges or other violations observed. WIP on vertical
|
General Inspection | 9/20/2019 | 9/20/2019 | 9/20/2019 | P | PASS |
Michael Zawacki
|
|
|
Met with foreman at site. Still waiting for site work to finish curbing and gutters, want to be paved asap. Trash is being picked up, none blowing off site. No esc issues.
|
General Inspection | 9/4/2019 | 9/4/2019 | 9/4/2019 | | PASS |
Michael Zawacki
|
|
|
Hotel is framed, loit isa below grade. Site is clean, no trackout or trash, no dust observed. Curbing completed around lot, is contained.
|
General Inspection | 7/19/2019 | 7/19/2019 | 7/19/2019 | | PASS |
Michael Zawacki
|
|
|
WIP on vertical. Two stabalized entrances at site. No dust or trackout. No loose trash.
|
Tracking Control | 4/4/2019 | 4/5/2019 | 4/8/2019 | A | PASS |
Michael Zawacki
|
|
|
Gate onto elder is shut, traffic being sent through stabalized entrance.
|
General Inspection | 4/1/2019 | 4/4/2019 | 4/4/2019 | A | FAIL |
Michael Zawacki
|
|
|
Trackout onto Elder directly from site. Gate to Elder is closed, still looks like it is being used for occasional access. Follow up for Friday to see if contractor cleans up or needs a correction issued.
|
General Inspection | 4/1/2019 | 4/1/2019 | 4/1/2019 | P | PART |
Michael Zawacki
|
|
|
Sand has been dumped on stabalized entrance for use in seepage beds. Some trackout from front onto Elder, sweeper on site. Will bring washout before pouring. Follow up scheduled for thursday.
|
Site Preparation | 3/1/2019 | 3/4/2019 | 3/4/2019 | A | PEND |
Michael Zawacki
|
|
|
Wattle needs to be trenched and stakes placed at 5'. Talked to project manager on site to get repaired. Entrance installed, DI protection installed.
|