Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberESC18-01285
StatusFinaled
Name BRYAN EVERMAN
Site Address 1701 S RAYMOND ST
Project NameICCU Overland Storage
Customer Number 
ePlanReviewNo
Description
Renovation to convert existing commercial building into a warehouse space for Idaho Central Credit Union.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final4/25/20194/25/20194/25/2019PPASS
DetailsMichael Zawacki
General Inspection4/25/20194/25/20194/25/2019PPASS
DetailsMichael Zawacki
Random Inspection2/8/20192/8/20192/8/2019PPASS
DetailsAndy J. Long
No trackout or discharges. RP on duty. Ecopan and trash containment in staging area.
General Inspection1/7/20191/16/20191/17/2019APASS
DetailsMichael Zawacki
Site is contained, no trackout. Site is below grade, pit run road has been built up to keep everyone from driving in mud. No ESC issues.
BMP Violation1/3/20191/7/20191/7/2019PCANC
DetailsAndy J. Long
duplicate entry, see Tracking Control inspection
Tracking Control1/4/20191/4/20191/7/2019PPASS
DetailsAndy J. Long
check on entrance and gutter

Corrections completed by G&S as requested.

- New construction entrance rock has been installed. Angular and has geotextile landing. Trucks bringing in rock for seepage swale are backing in on entrance and onto sand roadmix that has been layed to prevent muddy conditions.

- sidewalk and gutter has been swept.

Site is in compliance. Washout and trash dumpster are onsite. Permit posted.
General Inspection12/28/20181/2/20191/3/2019AFAIL
DetailsAndy J. Long
check on entrance

Corrections needed:

Entrance is compacted and will not work when muddy conditions return

Correction requests:
- scrape compacted rock to loosen hardened dirt.
- add additional angular rock to entrance to add edges to scape tires. Check construction details in ESC plan for specs.
- sweep sidewalk and gutter along Raymond Street next to project.

Written Correction notice posted with CM Company Darrel G.

Compliance is due Monday Jan 7 @12 PM
General Inspection12/28/201812/28/201812/28/2018PPART
DetailsAndy J. Long
Site inactive at time of inspection. Need to install the correcct style of construction entrance rock to prevent trackout. Current rock is round and not angular. Should be a minimum of 1.5" diameter.

Follow up scheduled.
General Inspection12/6/201812/6/201812/6/2018PPASS
DetailsMichael Zawacki
Construction entrance installed and no trackout. Woodchip wattle installed along perimeter. excavator on site ripping out old buildings concrete floor.
Site Preparation11/28/201811/29/201811/29/2018APASS
DetailsAndy J. Long
Darrell G. CM Company 10 AM

RPs are Darell G. and Jimmy Miller. Onsite walk through completed. BMPs include heavy duty construction entrance installation after existing asphalt and sidewalk are removed. Install gutter check bag sediment control (DI is over 200 M from site). Will be using Ecopan for concrete washout. Permit to be posted at NE corner of site near trailer.

Note: address on ESC permit is incorrect. 1701 S. Raymond. Change RPs on permit.
General Inspection11/29/201812/12/2018 P 
DetailsAndy J. Long