Site Final | 3/12/2020 | 3/12/2020 | 3/12/2020 | P | PASS |
Michael Zawacki
|
|
|
Any DI bags BlackRock should remove?
|
Aging Inspection | 1/14/2020 | 1/14/2020 | 1/14/2020 | | PASS |
Michael Zawacki
|
|
|
WIP on framing
|
Aging Inspection | 11/14/2019 | 11/14/2019 | 11/14/2019 | | PASS |
Michael Zawacki
|
|
|
Exterior done on block, still needs landscaping. Units to the east also under construction on same block.
|