Site Final | 1/6/2020 | 1/7/2020 | 1/7/2020 | P | PASS |
Michael Zawacki
|
|
|
Site will need final landscaping aroung sidewalks and parking islands and DIs pulled. Exterior work completed and site clean.
|
Conference | 12/23/2019 | 1/2/2020 | 1/6/2020 | A | CANC |
Andy J. Long
|
|
|
|
Conference | 12/20/2019 | 12/20/2019 | 12/23/2019 | P | CANC |
Andy J. Long
|
|
|
pre-final walk-through // Leonard Phone #: ###-####
rescheduled
|
General Inspection | 12/2/2019 | 12/2/2019 | 12/3/2019 | | PASS |
Michael Zawacki
|
|
|
Shell completed. Work on curbing and sidewalks . site is clean
|
General Inspection | 10/15/2019 | 10/15/2019 | 10/16/2019 | P | PASS |
Michael Zawacki
|
|
|
Builkding is up, area aroung it is all pit run. Everything contained in Knife River yard.
|
General Inspection | 10/15/2019 | 10/15/2019 | 10/15/2019 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/24/2019 | 7/24/2019 | 7/24/2019 | P | PASS |
Michael Zawacki
|
|
|
WIP on steel frame construction. Washout on site, was being used by pump truck at time of inspection. No ESC issues
|
General Inspection | 6/17/2019 | 6/17/2019 | 6/17/2019 | P | PASS |
Andy J. Long
|
|
|
WIP on frame for new equipment building. Construciton entrance installed. No trackout or fugitive dust observed.
|
Site Preparation | 2/7/2019 | 2/7/2019 | 2/13/2019 | P | PEND |
Michael Zawacki
|
|
|
No response from RP, site prep inspection not completed.
|