Site Final | 9/16/2019 | 9/16/2019 | 9/18/2019 | P | PASS |
Michael Zawacki
|
|
|
|
Tracking Control | 4/22/2019 | 4/22/2019 | 4/23/2019 | P | PASS |
Michael Zawacki
|
|
|
New entrance around washouts, sidealk swept and road cleaned. Met with Kyle on site, still some small areas he will get swept.
|
BMP Violation | 4/22/2019 | 4/23/2019 | 4/23/2019 | A | CANC |
Andy J. Long
|
|
|
|
Tracking Control | 4/19/2019 | 4/19/2019 | 4/19/2019 | P | FAIL |
Andy J. Long
|
|
|
Excessive trackout from excavation and concrete prep crew. Crew did not cleanup or prevent trackout.
Harris North already warned for trackout control, special investigation fee assessed.
|