Information based on query as of Wednesday, May 15, 2024.
Permit Information
Permit NumberESC19-00157
StatusIssued
Name ELDON OYADOMARI
Site Address 12250 W FRANKLIN RD
Project NameIdaho Power
Customer Number 
ePlanReviewNo
Description
Concrete washout containment required. Project within a gravel quick draining substation yard. Utilize existing stabilized access to prevent trackout. Install sediment protection on MS4 storm drain.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection7/20/20207/20/20207/21/2020 PASS
DetailsAndy J. Long
General Inspection5/18/20205/18/20205/18/2020 PASS
DetailsMichael Zawacki
Site is now gated, clean and contained.
Aging Inspection3/17/20203/17/20203/18/2020 CANC
DetailsAndy J. Long
General Inspection1/15/20201/15/20201/15/2020 PASS
DetailsMichael Zawacki
Conbtained to fenced in yard. Eldon keeps everything clean.
General Inspection11/12/201911/12/201911/12/2019 PASS
DetailsMichael Zawacki
Majority of work in fenced off area. Some pours outside fence, washout on site and used. Area on west is road bed mix, will need to watch tracking when wet.
General Inspection6/17/20196/17/20196/17/2019PPASS
DetailsAndy J. Long
General Inspection5/28/20195/28/20195/28/2019PPASS
DetailsMichael Zawacki
WIP. ARea is in substation, all pea gravel. Ecopan on site no ESC issues.
Site Preparation5/10/20195/13/20195/13/2019APASS
DetailsMichael Zawacki
Work area is fenced in power station. Perimeter exist around site Entire work area is clean gravel with multiple stable entrances.