Site Final | 7/25/2019 | 7/25/2019 | 7/26/2019 | P | PASS |
Michael Zawacki
|
|
|
Doug Phone #: ###-####
|
Site Preparation | 3/12/2019 | 3/13/2019 | 3/13/2019 | A | PASS |
Andy J. Long
|
|
|
Brandon Phone #: ###-####
Onsite meeting with onsite project manager Doug. w/ Beniton (884.0027)
Two new ADA ramps and exterior sewer line trenching associated with new bathroom.
Project to begin tomorrow. - Post ESC sign on Beniton sign. - supress any significant demolition dust sources -provide concrete washout - protect storm drain in parking lot on NE side of building. - call for site final when complete, cleaned, and stabilized.
Approved for construction.
|