Information based on query as of Friday, May 10, 2024.
Permit Information
Permit NumberESC19-00300
StatusFinaled
Name ZACH CARTER
Site Address 4795 W EMERALD ST
Project NameThe Commons Climbing Gym
Customer Number 
ePlanReviewNo
Description
Demolition of interior of buildings (2), demolition of roof of one of the buildings with vertical new construction to accommodate a rock climbing wall.

Joining of two separate buildings
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final4/8/20204/8/20204/9/2020PPASS
DetailsAndy J. Long
Construction complete. No disturbed area or loose material. Left a sediment bag in the parking lot storm drain, which can be managed by facility. No BMPs left on perimeter or in MS4. ESC permit finaled
General Inspection4/8/20204/8/20204/8/2020 CANC
DetailsAndy J. Long
General Inspection2/4/20202/4/20202/11/2020 PASS
DetailsAndy J. Long
WIP on interior. No trackout, discharges and spills.

Will need to sweep parking lot and aprons onto Pond and Emerald and remove temporary sediment bag installed on the private drainage to get site final.
Complaint Inspection12/4/201912/4/201912/4/2019PCANC
DetailsMichael Zawacki
Drainage issue, flooding neighboring business.
Talked with super Zach while at site. Roof doesn't have gutters yet. Today they are pouring curbing and sidewalk behind building. Issue was mud was mud and dirt being kicked up by water coming off roof. Doing what can be done in the meantime to alleviate. No changes have been made to existing grade.
Overall site is clean.
General Inspection11/1/201911/4/201911/6/2019APASS
DetailsAndy J. Long
check on spill clean up

Spill has been cleaned up, no dried residue in gutter on Pond. No new spills or uncontained washing/rinsing observed.
Random Inspection11/1/201911/1/201911/1/2019PFAIL
DetailsAndy J. Long
Dumped/spilled/rinsed material in gutter along Pond street.

Request to use absorbent material to soak up liquid, then let dry and do a dry sweep of any material left behind.
Site Preparation6/26/20196/26/20196/28/2019PPASS
DetailsAndy J. Long
Onsite storm drain has sediment protection installed. Surrounding hardscape and vegetation preserved. No trackout or other issues