DOC - Permit Finaled | 12/12/2019 | 12/12/2019 | 12/12/2019 | P | PASS |
Michael Zawacki
|
|
|
|
Site Preparation | 6/3/2019 | 6/4/2019 | 6/4/2019 | A | PASS |
Michael Zawacki
|
|
|
Ben Phone #: ###-#### Dumped washout cleaned and ecopan brought to site. Backfill has been removed from sidewalk and road cleaned. Once fee paid site will be good to go.
|
BMP Violation | 6/3/2019 | 6/3/2019 | 6/3/2019 | P | FAIL |
Michael Zawacki
|
|
|
SWO Issued. Washout dumped on 2451 Ashgrove, backfill on sidewalk. RP needs to clean mess and schedule reinspection, all trade parcel hold issued. Pictures sent to RP.
|