DOC - Permit Finaled | 2/24/2020 | 2/24/2020 | 2/24/2020 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/15/2019 | 11/15/2019 | 11/15/2019 | P | PASS |
Michael Zawacki
|
|
|
Site is being prepped for paving and final concrete pour. Scheduled for Tuesday, and will repair the road. New washout dug out and lined. Will pave first then do concrete work.
|
General Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 | P | PASS |
Andy J. Long
|
|
|
WIP on carwash structure and loading in subgrade for parking lot. Perimter sediment control, construction entrance, lined concrete washout are all installed andi in acceptable condition. RP onsite, requested that end of day sweeping of Bird occur due to the minor trackout and wet conditions.
Permit sign posted. Approved.
|