Permit Information
Permit NumberESC19-00780
StatusIssued
Name KEN LITZINGER
Site Address 1521 N 5TH ST
Project Name1521 N. 5th Street
Customer Number 
ePlanReviewNo
Description
Raise existing house to add basement, construct additions to the west and south sides and convert the attic to living space.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection8/5/20208/5/20208/5/2020 PASS
DetailsMichael Zawacki
No new activity. Home needs to go in for historic again.
General Inspection6/5/20206/5/20206/5/2020PPASS
DetailsMichael Zawacki
No vertical construction. Some block work around lot has been done. Sidewalk is continuously getting dirty and then cleaned. No blowing dust, have not received any complaints
Conference4/21/20204/21/20204/21/2020PPASS
DetailsMichael Zawacki
Talked to owner while walking dog. Have been given permission to replace backfill. Plans are in for review.
BMP Violation2/11/20202/14/20202/20/2020APASS
DetailsAndy J. Long
check for gutter clean up requested on Sherman and 5th

Gutter cleaned. Still needs to improve access to site to prevent trackout. Sidewalk has been swept. RP on duty, said he will continue to work on cleaning. Waiting for backfill to be completed.
General Inspection2/11/20202/11/20202/11/2020PFAIL
DetailsAndy J. Long
Sweep gutter on Sherman and mud onto of curb. Provid boot brush or shovel for mud removal by works.
General Inspection1/27/20201/27/20201/28/2020PFAIL
DetailsMichael Zawacki
Mud puddle on low section of sidewalk on 5th side. Mini excavator blocking sidewalk on Sherman side. Film of mud on sherman side. Some tracking from moving track steer. Pit run stored on 5th, pit run ramp on sherman.
General Inspection1/2/20201/2/20201/2/2020PPASS
DetailsMichael Zawacki
Gatorguard installed around backfill. Foundation poured and home resting on it. ASlley is muddy.
General Inspection12/9/201912/9/201912/9/2019PPART
DetailsMichael Zawacki
Gator guard along perimeter of lot and sidewalk. Some dirt still getting on sidewalk. Alley is very messy, some from construction some is that it is bare. Boot tracking across alley from workers and people using sidewalk, no clear path across alley.
No workers on site.
General Inspection11/19/201911/19/201911/19/2019PPASS
DetailsMichael Zawacki
Started filling in backfill. All m,aterial between road and sidewalks has been removed. Backfill still on lot, gator guard protecting sidewalks.
General Inspection10/25/201910/28/201910/28/2019PPASS
DetailsAndy J. Long
check for corrections.

Perimeter sediment controls installed as requested. Sediment check bag installed in gutter. Rock chip now onsite to be used for stabilzed access from parking to work area.

Approved.
General Inspection10/25/201910/25/201910/25/2019PPEND
DetailsAndy J. Long
Met with RP-GC Ken.

Corrective actions to occur:
- install wattle around stockpiles along 5th street sidewalk. Will need to be weighed down in areas where staking is not possible.
- install wattle at low point between sidewalk and alley (NW corner of lot) to treat runoff flowing to the Sherman street gutter
- install snake bag check dam on Sherman gutter
- clean Sherman gutter
- if stockpiles can not be backfill by end on November, will need to cover with tarps.
General Inspection10/16/201910/16/201910/16/2019PFAIL
DetailsMichael Zawacki
Washout dumped on 5th.
General Inspection10/14/201910/14/201910/15/2019PFAIL
DetailsAndy J. Long
No ESC permit sign posted. No perimeter sediment controls on site. Loose dirt in gutter on Sherman and dirt on sidewalks.

Notified RP to schedule conference.
Site Preparation9/3/20199/3/20199/4/2019PPEND
DetailsMichael Zawacki
Lots of dust when track steer is operating, none when not. Sent message to RP to do some dust control.
Sidewalks are getting swept.