DOC - Permit Finaled | 11/26/2019 | 11/26/2019 | 11/26/2019 | P | PASS |
Andy J. Long
|
|
|
|
Site Final | 10/23/2019 | 10/28/2019 | 10/24/2019 | P | DONE |
Bob Archibald
|
|
|
Scope of work completed. Small areas will revegitate next spring.
|
General Inspection | 8/23/2019 | 8/23/2019 | 8/23/2019 | P | PASS |
Michael Zawacki
|
|
|
Site prep looks completed for archery range. Site in contained. Police range still not demoed, lots of pallets of old rotting sandbags on site.
|
General Inspection | 7/25/2019 | 7/25/2019 | 7/26/2019 | P | PASS |
Michael Zawacki
|
|
|
WIP on all sites. Multiple water trucks on site, no dust. Construction entrance installed.
|
General Inspection | 7/1/2019 | 7/1/2019 | 7/1/2019 | P | PASS |
Michael Zawacki
|
|
|
No issues with demo, some materials need to be hauled off. Area is in flood containment, no way for water to leave site.
|