BMP Violation | 3/10/2020 | 3/12/2020 | 3/16/2020 | P | PASS |
Andy J. Long
|
|
|
Trash picked up, sidewalk and gutter have been cleaned. Crews parking on street. Placed gutter bag checks along Crestwood. Site conditions are much improved but will need daily monitoring and clean up by RP and onsite subcontractors.
|
Tracking Control | 3/10/2020 | 3/10/2020 | 3/10/2020 | P | FAIL |
Andy J. Long
|
|
|
Lots of accumulated mud in gutter. Street dirty. Loose trash around site, multiple units and only one trash container/trailor
Verbal correction notice to RP-GC Carl. Notify ESC 3rd party inspector JEC to fix inlet.
Storm drain protection improperly installed, no block for curb cut.
Multiple repeat violations & lack of clean up at site through duration of project. Compliance date is Thursday 3 PM
|