General Inspection | 8/5/2020 | 8/5/2020 | 8/5/2020 | | PASS |
Michael Zawacki
|
|
|
Landscape crew on site. Front is done, now working on rear.
|
General Inspection | 7/21/2020 | 7/21/2020 | 7/21/2020 | | PASS |
Michael Zawacki
|
|
|
Exterior work completed, still needs landscaping.
|
General Inspection | 7/1/2020 | 7/1/2020 | 7/1/2020 | | PASS |
Michael Zawacki
|
|
|
Exterior work and driveway completed. Site not landscaped.
|
General Inspection | 6/16/2020 | 6/16/2020 | 6/16/2020 | | PASS |
Michael Zawacki
|
|
|
Home is framed, exterior looks completed. Lot is clean. Driveway has been prepped for pour, not completed.
|