Site Final | 4/29/2020 | 4/29/2020 | 4/29/2020 | P | PASS |
Andy J. Long
|
|
|
HOme complete and landscaped. DI bags to remain in receiving storm drains for ongoing construction in Highlands Cove
|
General Inspection | 11/19/2019 | 11/19/2019 | 11/19/2019 | P | PART |
Andy J. Long
|
|
|
No permit sign posted. No site preparation inspeciton was requested.
No trackout,.spills, or discharges observed. Posted ESC permit sign on trash box.
|