Site Final | 8/11/2020 | 8/11/2020 | 8/11/2020 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 8/11/2020 | 8/11/2020 | 8/11/2020 | | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 5/19/2020 | 5/19/2020 | 5/21/2020 | P | PASS |
Andy J. Long
|
|
|
Approved for construction. Perimeter vegetation around project area preserved. ESC plan on site.
|