General Inspection | 6/16/2020 | 6/16/2020 | 6/16/2020 | P | PASS |
Michael Zawacki
|
|
|
Wattle and silt fence along perimeter, entrance installed. Hillside has been tacked, no rills. Area soft nough it is absorbing water.
|
General Inspection | 4/29/2020 | 5/13/2020 | 5/13/2020 | P | PASS |
Michael Zawacki
|
|
|
WIP on foundation and stemm walls, no workers on site. Washout pan on site. Perimeter silt fence and wattle installed, lots of backfill on site. Stabilized entrance, no trackout or runoff.
|
General Inspection | 4/29/2020 | 4/29/2020 | 4/29/2020 | P | PASS |
Andy J. Long
|
|
|
BMPs installed. Concrete washout pan onsite and was used for foundation. No trackout, workers parking on pavement.
Approved.
GC Randy will be onsite regularly and can manage correction requests ###-####
|
Site Preparation | 4/29/2020 | 4/29/2020 | 4/29/2020 | P | FAIL |
Andy J. Long
|
|
|
No site prep requested. No runoff or issues, BMPs installed.
Notified builder and excavator to make sure to schedule the ESC site preparation inspection for foothills residential homes.
|