General Inspection | 7/27/2020 | 7/27/2020 | 7/27/2020 | P | PASS |
Michael Zawacki
|
|
|
All site work looks completed. Still some stockpiles on paved lot. All roads and sidewalks rebuilt. Truck on site to haul away job trailer. Suez crew on site flushing hydrants onto roads, no picked up sediment. Fence contractor hauling off chain link perimeter fence. Area still needs to be landcaped.
|
General Inspection | 3/9/2020 | 3/9/2020 | 3/9/2020 | P | PASS |
Michael Zawacki
|
|
|
Most trench excavation looks completed. Roads still need repairs. Trenches are shallow, looks like majority of deep excavation done.
|
General Inspection | 1/31/2020 | 2/13/2020 | 2/14/2020 | P | PASS |
Michael Zawacki
|
|
|
Gate was closed. Silt fence installed. DI bags in place, gravel snake bags also installed. Did not see permit sign on Owyhee.
|
Site Preparation | 1/30/2020 | 1/31/2020 | 1/31/2020 | P | PASS |
Andy J. Long
|
|
|
Site set up for intial phase for utility line relocation. Lower perimeter silt fence at Owyhee and storm drain protection installed. Reqeusted that ESC permit sing be placed with project sign that is viewable from perimter. Everett onsite, JC is RP.
Approved for construction.
|