General Inspection | 7/21/2020 | 7/21/2020 | 7/23/2020 | P | PASS |
Michael Zawacki
|
|
|
No building activity, lot is starting to overgrow.
|
General Inspection | 4/17/2020 | 4/17/2020 | 4/17/2020 | P | PASS |
Michael Zawacki
|
|
|
No one at site, grader is on and idleing. Perimeter silt fence still in place. Some piles of old asphalt and waste. No issues at site.
|
General Inspection | 4/17/2020 | 4/17/2020 | 4/17/2020 | P | CANC |
Michael Zawacki
|
|
|
entry error
|
General Inspection | 3/18/2020 | 3/19/2020 | 3/23/2020 | P | PASS |
Andy J. Long
|
|
|
No activity at time of inspection. Construction entrance installed. No trackout or windblown dust observed. Trash pile picked up.
No corrections requested.
|
General Inspection | 3/3/2020 | 3/11/2020 | 3/18/2020 | A | CANC |
Andy J. Long
|
|
|
check for construciton entrance etc
|
Site Preparation | 2/28/2020 | 3/2/2020 | 3/3/2020 | A | PASS |
Andy J. Long
|
|
|
Site meeting with RP Randy and project superintendant Seth.
-ESC permit sign posted -SWPPP binder onsite -Silt fence properly installed along north border to protect Fivemile Creek -Will have water truck onsite for dust control -Will use an above ground pan service for concrete washout -Will have dumpster for trash containment
Grading has already started as well as canal infrastructure work around the perimter.
No trackout or fugitive dust occuring
Correction requests: - update SWPPP binder with inspection reports - install full size construction entrance - clean up debris pile and dried concrete washout dumps - prevent dumping with gate or no trespassig sign
Follow up inspection scheduledm 3/11
|