Site Preparation | 3/13/2020 | 3/13/2020 | 3/16/2020 | P | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 3/12/2020 | 3/16/2020 | 3/16/2020 | A | PASS |
Andy J. Long
|
|
|
Retaining wall project in backyard, hillside zone.
Permit sign posted out front.
Downslope perimeter sediment control fencing and wattle are installed along the fence, vegetation preserved outside of site. NO construction on front of home and street except for site access.
Approved.
|
Site Preparation | 3/10/2020 | 3/11/2020 | 3/11/2020 | A | PEND |
Andy J. Long
|
|
|
Lindsay PM w/ Farwest
2088911787 at 9 AM
to be rescheduled by contractor, site not ready for construction
|