General Inspection | 8/10/2020 | 8/10/2020 | 8/10/2020 | P | PASS |
Michael Zawacki
|
|
|
WIP on framing. All material stored on site, scrap is piled, didn't see much trash.
|
General Inspection | 7/21/2020 | 7/21/2020 | 7/21/2020 | P | PASS |
Michael Zawacki
|
|
|
Foundation completed. 2 piles of backfill, they are putting pressure on silt fence. Trash is within foundation walls, piled in corner. Site will need dust controll when there is activity. No one on site.
|
General Inspection | 7/6/2020 | 7/6/2020 | 7/9/2020 | P | PART |
Andy J. Long
|
|
|
no site prep...uncontained washout?
No construction installed. Washout appears to have been cleaned up. Posted ESC permit sign.
Silt fence is installed properly, storm drain has sediment bag installed.
Notified RP about hillside site preps and request to install consturction entrance and stormwater control berm installed.
|