General Inspection | 8/11/2020 | 8/11/2020 | 8/11/2020 | P | PASS |
Michael Zawacki
|
|
|
New site work beginning east of current homes. All home work is on Zafre court. No issues at site.
|
Site Preparation | 6/9/2020 | 6/11/2020 | 6/12/2020 | P | PASS |
Andy J. Long
|
|
|
Steve Phone #: ###-####
ESC plan & permit posted on Snow Bird just south of Zaffre Ridge.
Will install construction entrance to equipment staging area to the left of the road cut.
NO adjacent surface waters. Surrounding inlets in subdivision have sediment protection installed.
Rough grading in prgross by Guches. Doing good work with water truck to keep down dust.
Approved
|