Permit Information
Permit NumberFIR08-00289
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 898 W GOWEN RD
Project NameNORCO FILL PLANT
Customer Number 
ePlanReview 
Description
OH Scope:
Beginning from an existing 8” supply located with the 1 hour rated riser room located at the SE corner of the building, install a 6” vertical wet riser to serve through out the entire structure. Any future modifications of the system for plant equipment will require a separate permit. The fire sprinkler system work shall comply with the IFC 2006, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD06-03163 & UG permit FIR08-00222.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/3/200810/6/200810/6/2008APASS
DetailsForrest France
Three C/N items repaired, forward flow testing completed acceptable, fire sprinkler permit finaled.
INSP-Final Inspection9/30/20089/30/200810/1/2008PDEFR
DetailsForrest France
See inspection notes dated 10/1
INSP-Final Inspection9/30/200810/1/200810/1/2008AFAIL
DetailsForrest France
Need to provide a PRV at the riser due to the grid system design, noted one leaking sprinkler drop above the restroom ceiling, forward flow testing of the DC backflow preventer failed.
INSP-Final Inspection9/24/20089/25/20089/25/2008PCANC
DetailsForrest France
final Inspection - contact: Todd
Phone #: ###-#### x1234 Internet Inspection Request from: Alicia Pauley NOTE: Inspection rescheduled per conversation with contractor pending fire alarm interconnections
INSP-Final Inspection9/23/20089/24/20089/24/2008ACANC
DetailsTroy Cobbley
To be rescheduled with the fire alarm testing.
INSP-Sprinkler Rough-in/Hydro9/5/20089/8/20089/8/2008APART
DetailsForrest France
Overhead hydrostatic retest passed inspection.
INSP-Sprinkler Rough-in/Hydro9/4/20089/4/20089/4/2008ANR
DetailsForrest France
Site visit confirmed repairs for leakage at overhead piping are not yet complete for re-test.
INSP-Sprinkler Rough-in/Hydro9/3/20089/3/20089/3/2008PFAIL
DetailsForrest France
Overhead hydrostatic testing failed due to visible system leakage at four locations.
INSP-Sprinkler Rough-in/Hydro8/27/20088/27/20088/27/2008APART
DetailsForrest France
See stamped plan set for locations inspected and okayed for cover.
INSP-Sprinkler Rough-in/Hydro8/25/20088/26/20088/26/2008PPART
DetailsForrest France
Overhead work at the drop ceiling and hard lid areas are approved for cover-see circled and initialed location on plans, noted one head to be adjusted due to minor overspacing at the hallway intersection, painted heads at the restrooms need to be replaced. Remainder of installation not yet inspected.
INSP-Conference8/8/20088/19/20088/19/2008ADONE
DetailsForrest France
9:00 a.m. on site conference inspection with all trades - for any questions contact Jim Storey
INSP-Sprinkler Rough-in7/22/20087/22/20087/22/2008PPART
DetailsForrest France
Site visit to verify seismic restraint at beam clamps for system piping hangers prior to structural fireproofing throughout.