INSP-Final Inspection | 2/10/2010 | 2/10/2010 | 2/10/2010 | A | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final walkthrough, permit finaled.
|
INSP-Final Inspection | 2/1/2010 | 2/1/2010 | 2/1/2010 | A | PART |
Forrest France
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 11/27/2009 | 11/27/2009 | 11/27/2009 | A | PART |
Forrest France
|
|
|
Final pending project related FIR09-00347.
|
INSP-Sprinkler Rough-in | 11/16/2009 | 11/16/2009 | 11/16/2009 | P | PART |
Forrest France
|
|
|
Overhead work approved for cover at the sheetrock ceilings throughout.
|
INSP-Sprinkler Rough-in | 11/9/2009 | 11/10/2009 | 11/10/2009 | A | PART |
Forrest France
|
|
|
Inspection to verify insulation fill at four concealed spaces, added upright protection at the south side for exposed wood above the drop ceiling, and previous C/N items completed okay. Discussed hydrostatic testing and job finish schedule.
|
INSP-Sprinkler Rough-in | 11/5/2009 | 11/5/2009 | 11/5/2009 | P | PART |
Forrest France
|
|
|
Partial overhead cover approved as discussed.
|
INSP-Sprinkler Rough-in | 11/4/2009 | 11/4/2009 | 11/4/2009 | P | PART |
Forrest France
|
|
|
Okay to cover except the SW area where combustible construction above the drop ceilings is exposed, noted one upright head to be relocated due to obstruction by a truss web at the attic area north side, insulation at two branchline feeds to dry sidewall heads adjusted while on site, remainder of previously noted correction items are finished, minor field modifications at some locations okayed, still need to verify insulation install at exterior canopies as discussed.
|
INSP-Sprinkler Rough-in | 11/2/2009 | 11/2/2009 | 11/2/2009 | P | PART |
Forrest France
|
|
|
Inspection for cover at the hard lid ceilings for the first floor passed with the exception of annotated areas including a missing hanger, insulation to be moved, one incompleted branchline serving two rooms, added and deleted heads to be shown on record drawings, exposed wood above partition walls to be sheetrocked or protected with sprinklers, need to schedule inspeciton for insulation fill at concealed pockets.
|
INSP-Sprinkler Rough-in | 10/29/2009 | 10/30/2009 | 10/30/2009 | A | PART |
Forrest France
|
|
|
See stamped plan set for areas of the attic system piping inspected and okayed -marked with today's date.
|
INSP-Sprinkler Rough-in | 10/28/2009 | 10/29/2009 | 10/29/2009 | P | CANC |
Troy Cobbley
|
|
|
Overbooked. Rescheduled with Jake for tomorrow.
|
INSP-Sprinkler Rough-in/Hydro | 10/20/2009 | 10/20/2009 | 10/20/2009 | A | PART |
Forrest France
|
|
|
Jake Phone#: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 10/19/2009 | 10/19/2009 | 10/19/2009 | P | PART |
Forrest France
|
|
|
See annotations on plan set marked with today's date for inspection notes including two blocked upright heads by adjacent truss web members, insulation at the deck needs lifted away from deflectors at two heads, install baffle or relocate two heads which exceed min. spacing. Discussed seismic bracing and coverage at the front entry vestibule. Noted correction items from the previous inspection are finished.
|
INSP-Sprinkler Rough-in | 10/14/2009 | 10/15/2009 | 10/15/2009 | A | FAIL |
Troy Cobbley
|
|
|
Inspection performed by tim. Per tim there was missing piping, sprinkler heads, branchline restraints........ect. Only the south 1/3 of the building was inspected as requested by fire sprinkler contractor and as directed by the job superintendant. No piping can be covered until re-inspection.
|
INSP-Sprinkler Rough-in | 10/14/2009 | 10/14/2009 | 10/14/2009 | P | CANC |
Troy Cobbley
|
|
|
Overbooked. I spoke to Jake and will reschedule for tomorrow.
|
INSP-Sprinkler Rough-in/Hydro | 10/13/2009 | 10/14/2009 | 10/14/2009 | A | FAIL |
Troy Cobbley
|
|
|
No one answered the contact phone number and when I got to the project I could not find any sprinkler fitters. No inspection was performed.
|
INSP-Sprinkler Rough-in/Hydro | 10/5/2009 | 10/5/2009 | 10/5/2009 | A | NR |
Forrest France
|
|
|
Work in progress, construction underway.
|
FIR-Aging Inspection | 9/25/2009 | 9/25/2009 | 9/25/2009 | | DONE |
Forrest France
|
|
|
In progress
|