INSP-Final Inspection | 12/11/2009 | 12/14/2009 | 12/14/2009 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final inspection, contractor to provide "911" sign at the outside bell as discussed.
|
INSP-Sprinkler Rough-in/Hydro | 11/24/2009 | 11/24/2009 | 11/27/2009 | P | PART |
Forrest France
|
|
|
Okay to cover overhead per activity notes.
|
INSP-Sprinkler Rough-in | 10/28/2009 | 10/29/2009 | 10/29/2009 | A | PASS |
Troy Cobbley
|
|
|
The sprinkler piping is ok for cover. Tenting is complete. Several locations needed to be modified while I waited.
|
INSP-Sprinkler Rough-in/Hydro | 10/28/2009 | 10/28/2009 | 10/28/2009 | P | NR |
Forrest France
|
|
|
Insulation work incomplete, not ready for inspection at this time per contractor.
|
INSP-Sprinkler Rough-in/Hydro | 10/23/2009 | 10/23/2009 | 10/23/2009 | A | PART |
Forrest France
|
|
|
See notes on stamped plan set.
|
INSP-Sprinkler Rough-in | 10/21/2009 | 10/21/2009 | 10/22/2009 | P | PART |
Forrest France
|
|
|
Duplicate, see site inspection comments 10/22.
|
INSP-Sprinkler Rough-in/Hydro | 10/22/2009 | 10/22/2009 | 10/22/2009 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler rough-in inspection passed with the exception of two locations marked on plans in need of hangers/branchline restraint, cover is not approved until tenting/insulation is completed and inspected for cold cavity protection, be aware of light fixure obstructions that may develop depending on equipment installed, minor field mods. in pipe runs okayed due to 20% cushion in calcs, riser is not yet built.
|