The Fire Sprinkler Scope of work consists of changing all standard response to quick response due to building area increase. There are three risers with four wet valves. Each riser will have a new backflow preventer installed. The project has been divided into thirteen phases.

(IDAHO DEPARTMENT OF HEALTH AND WELFARE) (INTERIOR REMODEL) (SOUTH BUILDING) Fire sprinklers used for building area increase and for code trade-offs. To remodel the interior of an existing 73,639 square foot building for the current tenant. Several existing restrooms will be upgraded to be accessible to the disabled. Work is to include interior nonbearing walls, interior doors, interior windows, millwork, finishes, and an exterior ramp. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. The fire sprinkler system is required to be upgraded to comply with current standards, including quick-response sprinklers, in order to avoid enclosed 1-hr fire-resistance-rated corridors. Elements of the existing fire sprinkler system that already comply with current standards may remain without upgrade. This building remodel will be done in phases. Occupancy of a completed phase shall be coordinated with the Structural Inspector and Fire Inspector. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/27/20107/28/20107/28/2010APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection7/13/20107/14/20107/14/2010AFAIL
DetailsTroy Cobbley
Todays inspection was for the revised risers. The new inspectors tests and flow switches functioned correctly. Also inspected were the phase 13 sprinkler piping which can be covered. Sprinkler coverage is lacking in an entry foyer in this same area.
INSP-Sprinkler Rough-in7/1/20107/2/20107/2/2010APART
DetailsTroy Cobbley
Phase II sprinkler work is complete. We could not test the devices at the modified riser because of no access to the inspectors test in PoJo's and the correct orfice in the Dept. of Health/welfare was missing.
INSP-Sprinkler Rough-in6/11/20106/11/20106/11/2010PPASS
DetailsTroy Cobbley
Phase 10 sprinkler piping is complete.
INSP-Sprinkler Rough-in5/13/20105/14/20105/14/2010APASS
DetailsTroy Cobbley
Fire sprinkler risers #2 and #3 inspected today. Flow switches and tamper switches functioned correctly. Noted that the backflow preventors need their certifications.
INSP-Sprinkler Rough-in3/23/20103/24/20103/24/2010APASS
DetailsTroy Cobbley
The phase 8 sprinkler piping is passed.
INSP-Sprinkler Rough-in1/14/20101/15/20101/15/2010APART
DetailsTroy Cobbley
Todays inspection was a partial for Area #6. See the city approved plans for this location clouded in red. Piping can be covered except for the two pendant heads that need to be added due to overspacing. These have been clouded as well.
INSP-Sprinkler Rough-in11/16/200911/16/200911/16/2009PPASS
DetailsTroy Cobbley
Phase 4 sprinkler piping is ok to cover. Two heads off of 1" piping is ok at this end of the building per Tim Frost. Note #10 of the review comments is a typ error.
INSP-Sprinkler Rough-in11/3/200911/3/200911/3/2009PPASS
DetailsTroy Cobbley
Phase 2 sprinkler piping can be covered. Insulation at the deck needs re-attached and will be verified at the building final.
INSP-Sprinkler Rough-in10/29/200910/30/200910/30/2009APASS
DetailsTroy Cobbley
The sprinkler piping for Phase 3 can be covered.